Cappah completed all formwork for this 30,000 square metre development,which comprises of a significant podium structure and two residential towers. The formwork involved both conventional and panel systems. We had to come up with an efficient method to build due to crane restrictions.
The project builder was Brick Construction.
Cappah was contracted by client ADCO to complete the formwork for the new National Storage in Springfield. This major project consisted of over 10,000m2 of formwork, enabling Cappah to use our panel system to not only minimize materials on site but also accelerate the job timeline. Cappah delivered a high quality end result, which came in on budget and ahead of time.
Partnering with Industry Leaders Hutchinson builders, we were engaged to complete the complex formwork component on this project. The superbly designed residential development required a large podium structure with six levels, and a concrete roof. Using our highly efficient Ischebeck system we were able to achieve all the required to-quality finishes and to accelerate the project timeline.
This major medical facility required contract works including formwork to the two storey hospital expansion. Our formwork scope covered installation of wall shutters, column boxes and suspended slabs. Using our Deck Fast shoring system was a substantial advantage on the project’s very large floor plates.
Cappah was engaged by client Groupline to complete both the formwork and concrete packages.
Cappah was contracted by client ADCO to complete the formwork and concrete packages. This development consisted of seven two-storey block extensions to the existing site formerly known as Joyce Wilding Centre.
This project will benefit the local Community to aid vulnerable women and Children.